Bidwells Urban Design Studio are appointment to progress proposals for development of a new school to the south-east of Cambridge.
The development includes a 200-pupil primary and 250-pupil secondary school adjacent to an existing nursery/ junior school. Working alongside Cambridge-based Architect ChadwickDryerClarke the proposals will be developed over a 12 month period, with view to commencement on site in 2016 and completion for the start of the 2017/2018 school year.
What we did
- Our Urban Design Studio were appointment to progress proposals for the development of a new school to the south-east of Cambridge
-
Working alongside Cambridge-based Architect Chadwick Dryer Clarke, the proposals were developed over a 12 month period
Result
- The project was delivered through to pre-application stage and the project is currently on hold awaiting future client instruction
450 pupil
secondary school
Images